Home » News » Local News » Ironman Returns to Centre County. What to Know About Road Closures

Ironman Returns to Centre County. What to Know About Road Closures

State College - ironman 24 2

Competitors participate in the cycling portion of the Ironman 70.3 Happy Valley on June 30, 2024. Photo by Greg Guise

Geoff Rushton

,

The Ironman 70.3 Pennsylvania Happy Valley returns for its third year on Sunday, June 15, and once again there will be a number of traffic impacts around the region.

In 2023, the event welcomed more than 1,600 competitors from 41 states and 12 countries, supported by 1,000 volunteers. According to a report from the Happy Valley Sports and Entertainment Alliance, it generated $3.2 million for the local economy.

Sunday will mark the final “half-Ironman” in a three-year contract to host the event in Centre County, but local tourism officials have expressed optimism that the triathlon will be renewed for future years.

This year’s edition features a few changes, starting with the date. While the first Ironman Happy Valley was held on July 2 and last year’s on June 30, the 2025 event was moved up two weeks to Father’s Day because of conflicts with move-in for Penn State’s second summer session.

The Ironman Village has moved to the Jordan East lot

The race route remains largely the same, except at the finish. The previous two editions saw runners cross the finish line around the 50-yard line in Beaver Stadium. They will still loop through the inside of the stadium this year, but will cross the finish line on Curtin Road just outside.

As in the past, the triathlon will start at 7 a.m. with a 1.2-mile swim in Foster Joseph Sayers Lake at Bald Eagle State Park.

The second leg is a 56-mile bike race that heads north into Mill Hall before turning south, making its way over Hubler Ridge and Pleasant Gap, descending to Centre Hall, then heading toward the State College area and making a final turn north to the Penn State campus.

Completing the half-Ironman is a 13.1-mile run through campus.

Motorists should be aware of the following traffic impacts — including road closures, closures with local access only and event traffic conditions — and use alternate routes when possible.

Most closures and event traffic conditions will occur in the morning and early afternoon on Sunday. Nearly 20 Penn State campus parking lots also will be closed or have limited access.

BIKE COURSE TRAFFIC IMPACT (All times are for June 15 unless otherwise noted)

ROAD IMPACTEDFROMTOIMPACTTIMES
Commuter DriveCurtin RoadDauer DriveClosed8 a.m. 6/14 to  6 p.m. 6:30
Curtin RoadUniversity DrivePorter RoadClosed3 a.m. to 6 p.m.
Bald Eagle State ParkRoute 150/Eagle Valley RoadOld Route 220Closed7 a.m. to 10 a.m.
Route 150/Eagle Valley Road (Eastbound)Main Park RoadBeech Creek AvenueEvent Traffic7:30 a.m. to 10:30 a.m.
Beech Creek AvenueRoutet 150/Eagle Valley RoadWater StreetClosed – Local Access Only6:30 a.m. to 10:30 a.m.
Water Street (Southbound)Beech Creek AvenueJacksonville RoadEvent Traffic7:30 a.m. to 11 a.m.
Jacksonville Road (Westbound)Water StreetHubler Ridge RoadEvent Traffic7:30 a.m. to noon
Hubler Ridge Road (Southbound)Jacksonville RoadNittany Valley Drive/Route 64Event Traffic8 a.m. to noon
Nittany Valley Drive/Routet 64/ College Ave. (Westbound)Hubler Ridge RoadHarrison RoadEvent Traffic8 a.m. to 1 p.m.
Harrison RoadCollege Avenue/ Route 26Main Street/Route 144Closed – Local Access Only8:30 a.m. to 1 p.m.
Main Street/Route 144/ Pennsylvania Ave. (Southbound)Sunset AvenueBlack Bear DriveClosed – Local Access Only8:30 a.m. to 1 p.m.
Route 144/Pennsylvania Ave.Black Bear DriveChurch StreetClosed8:30 a.m. to 1 p.m.
Route 144/Pennsylvania Ave (Northbound)Church StreetKelly StreetClosed – Local Access Only8:30 a.m. to 1 p.m.
Church Street/Upper Brush Valley Road (Westbound)Route 144/Pennsylvania Ave.Linden Hall RoadEvent Traffic9 a.m. to 1:30 p.m.
Boalsburg Road (Northbound)Linden Hall RoadBranch RoadEvent Traffic9 a.m. to 2 p.m.
Access to Boalsburg Road from Nittany Orchards Neighborhood is closed. Detour to Whitehill & Berry.
Branch Road (South & Northbound)Boalsburg RoadSouth Atherton StreetEvent Traffic9 a.m. to 2 p.m.
Country Club RoadEast College AvenueBranch RoadClosed – Local & Club Access Only9 a.m. to 2 p.m.
University Drive (Northbound)South Atherton StreetEasterly ParkwayEvent Traffic9 a.m. to 2 p.m.
University Drive (Northbound)Easterly ParkwayCollege AvenueClosed – Local Access Only9 a.m. to 2 p.m.
University DriveEast College AvenuePark AvenueClosed8 a.m. to 4:30 p.m.
E.College Ave. (Westbound)University Drive On-RampClosed8 a.m. to 4:30 p.m.

RUN COURSE TRAFFIC IMPACT — UNIVERSITY PARK CAMPUS (All times for Sunday, June 15)

ROAD IMPACTEDFROMTOIMPACTTIMES
Curtin RoadUniversity DrivePorter RoadClosed3 a.m. to 6 p.m.
Curtin RoadNorth Atherton StreetUniversity DriveClosed8 a.m. to 4:30 p.m.
University DrivePark AvenueEast College AvenueClosed8 a.m. to 4:30 p.m.
Hastings RoadMcKean RoadUniversity DriveClosed8:30 a.m. to 4:30 p.m.
McKean RoadShortlidge RoadBigler RoadClosed8:30 a.m. to 4:30 p.m.
Mifflin RoadMcKean RoadPollock RoadClosed8:30 a.m. to 4:30 p.m.
Pollock RoadMifflin RoadNorth Burrowes RoadClosed8 a.m. to 4 p.m.
West Campus DriveNorth Patterson StreetNorth Barnard StreetClosed8:30 a.m. to 4 p.m.
Shortlidge RoadCurtin RoadPollock RoadClosed8:30 a.m. to 4 p.m.

CAMPUS PARKING CLOSURESNO ACCESS IN OR OUT

A section of Stadium West near Gate B at Beaver Stadium and the north section of Jordan East were closed beginning June 10 and will remain closed through Tuesday, June 17.

Sunday closures:

  • Brown B
  • Brown E
  • Green C
  • Orange L (Multi-Sport Facility and Bryce Jordan Center back lot sections)
  • Red H
  • Silver B (all sections)
  • Silver G
  • Silver J (all sections)
  • Silver N
  • Yellow E (both sections)
  • Yellow H (all sections except by the Nittany Lion Softball Park)
  • Yellow L
  • Yellow R
  • Lot 42

CAMPUS PARKING LIMITED ACCESS (Single entrance/exit on Bigler Road at Curtin Road. Entry and exit will only permitted when possible for vehicles to cross safely between event participants.)

  • Yellow F (Eisenhower Deck and surface lot)
  • Yellow S
  • Yellow T (Pollock section)
  • Lot 22
  • Lot 81

Lot 82 (McKean/Pennypacker section) will only be accessible via Park Avenue.

Penn State is encouraging permit holders who need to park on campus on Sunday to use the East, HUB, Nittany and West decks.

“A single crossing to access Eisenhower Deck and other areas inside the running route will be maintained on Bigler Road at Curtin Road,” according to Penn State Transportation Services. “Crossing Curtin Road will only be allowed between athletes, and delays may be significant.”

wrong short-code parameters for ads